⚠ NEW
M25 Traffic

M25 Clockwise Traffic

1Accidentsreported on the M25 — and the overhead signs show LEFT TUNNEL CLOSED — see the signs4Roadworks activelive on the M25 right now — see details13Plannedscheduled on the M25 — see details

Live M25 traffic data from National Highways · updated 02:57 Sat 3 Oct 2026

M25

M25 Clockwise Traffic

Heading clockwise on the M25? This page shows the traffic news for the clockwise carriageway only: accidents, closures, roadworks and delays affecting drivers going round the M25 in the direction the junction numbers go up.

Clockwise, the M25 runs from the Dartford Crossing at Junction 1A south through Kent and Surrey, past Heathrow at Junction 15, round the north through Hertfordshire to Junction 27 for the M11, and down through Essex to Junction 31. At Dartford, clockwise traffic crosses the Thames on the Queen Elizabeth II Bridge.

Going the other way? See M25 anticlockwise traffic, or see both carriageways at once on the live M25 traffic flow map.

Latest M25 Clockwise Traffic News

The news below is for the clockwise carriageway, newest first. For both directions, see all the latest M25 traffic news.

Search all the latest M25 traffic news

Latest accident or incident on the M25 clockwise

The most recent accident or incident on the M25 clockwise that we are aware of.

  • M25 Clockwise Jct 30 carriageway closure between entry and exit slip

    Active nowUpdateClockwise Road closed
    Time now: Saturday, 3 October 2026, 02:57

    02:543 Oct 2026reported 2 min ago

    Location
    M25 clockwise within J30
    Direction
    Clockwise
    Lanes closed
    Carriageway closed
    Reason
    Other
    Schedule
    23:00 Fri 2 Oct 2026 → 06:00 Sat 3 Oct 2026
    ⏳Expected to clear in ~3h 02m HA planned end: 06:00 Sat 3 Oct 2026
  • Latest active roadworks on the M25 clockwise

    Roadworks live on the M25 clockwise right now.

    Good news - no roadworks currently active on the M25 clockwise.

    Latest planned roadworks on the M25 clockwise

    The next planned roadworks scheduled on the M25 clockwise.

  • M25 Jct31 clockwise entry slip closure

    PlannedUpdateClockwise Road closed
    Time now: Saturday, 3 October 2026, 02:57

    02:543 Oct 2026reported 2 min ago

    Location
    M25 J31 clockwise access
    Direction
    Clockwise
    Lanes closed
    Carriageway closed
    Reason
    Repair work
    Schedule
    22:00 Fri 2 Oct 2026 → 05:30 Sat 3 Oct 2026

    Forecast - not confirmed

    🚧HA scheduled: 22:00 Fri 2 Oct 2026 → 05:30 Sat 3 Oct 2026 underway until 05:30 Sat 3 Oct 2026
  • + 6 more planned roadworks - search all M25 traffic news →

    Road closed — on the overhead signs now

    National Highways’ overhead signs are showing a road closure, as at 02:57 Sat 3 Oct 2026.

    • LEFT TUNNEL CLOSED

      On the signs now Road closed
      Time now: Saturday, 3 October 2026, 02:57

      20:592 Oct 2026set 6 hrs ago⚠ 6 hrs old✓ Checked by us 02:57

      LEFT TUNNEL
      CLOSED

      Overhead Message

      WhereA282 anti-clockwise · on 3 signs
      Also onA282 signs only
      SinceSet 20:59 Fri 2 Oct 2026
      We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.

    See all the M25 overhead signs

    Search all the latest M25 traffic news

    Updated 02:57 Sat 3 Oct 2026

    Powered by National Highways’ Transport Data Feeds.

    Roadworks Info

    The main source of our roadworks information is Traffic England, formally the Highways Agency, which is the government department specifically tasked with maintaining England's roads. This is therefore usually one of the most reliable sources of roadworks updates.

    Each roadworks report has:

    • Report title
    • Date Released or updated
    • Category or Source
    • Location
    • Schedule
    • Summary

    The roadworks update title is a brief summary of main facts.

    The remainder of the report is the detail of when the report was released or updated and details of what the roadworks are, where they are, and how long they are expected to last.

    How any accidents on the M25 are affecting speed of traffic flow

    M25 Traffic now features real time traffic flow information from Google maps which will show how current accidents are slowing traffic speed.

    Using the traffic flow map in conjunction with our traffic news helps to gauge the affect any accidents on the M25 are slowing down traffic.

    We see reports of accidents on the M25 most days. Our aim is to feature all the current accident reports from Traffic England as soon as they are reported.

    You should never drive and text at the same time. This creates a massive risk of a traffic accident to you and others around you.

    Be alert, be aware, take care. Be safe.

    You should never drive and use your phone at the same time. Have a passenger check our latest news for you.


    On any single day you can find information about both current and planned roadworks so that you are aware of possible delays and holdups on your journey.

    As a major motorway, and a very busy one, we often feature dozens of up to date reports and updates and you can find all of them in our central search news page.

    This page highlights up to ten of the most recent and latest reports.

    Our search page enables you to search by category and narrow your search down to specific junctions and specific words such as "clockwise" or "anti-clockwise" which can be very useful.

    Why M25 roadworks and lane closures happen at night

    It is a fair question — why is so much M25 motorway work done in the small hours, and why do the same roadworks take so many nights? The Department for Transport’s own hourly traffic counts answer it, and it is worth knowing before judging today’s M25 roadworks too harshly.

    12,808

    M25 traffic, quietest hour

    counted on a normal weekday between 7am and 6pm — and it falls at midday. There is no daytime window quiet enough to close an M25 lane in.

    14,457

    in the busiest hour

    at 7am. Only 12.9% separates that from the quietest hour, so daytime M25 roadworks cause delays at any hour you choose to start them.

    241

    vehicles a minute

    through the busiest hour on the M25 motorway, both directions. Closing one lane of four removes capacity the traffic simply cannot make up — which is how a short closure becomes long delays.

    28,211

    lorries a day

    at the eastern end of the M25. Overnight roadworks keep that freight moving through the day, which is when most of it has to be somewhere.

    So the M25 roadworks you see coned off at two in the morning with nobody in them are usually the safest and least disruptive way to do the job. The alternative is not fewer roadworks — it is the same roadworks at four in the afternoon. Either way, the latest M25 roadworks and lane closure updates for today are on this page, refreshed through the day — alongside the rest of the M25 motorway traffic news.

    Hourly figures are from the Department for Transport’s own count point beside junction 14, counted on 23 April 2025 and published on 20 May 2026.

    M25traffic.co.uk is dedicated to the latest M25 news updated every few minutes, 24 hours a day 7 days a week, 365 days of the year. More features coming. See www.trafficnewsengland.co.uk for ALL ENGLAND traffic news and M1Traffic.co.uk for M1 dedicated news.